The lot (or lot number) identifies the manufacturer production batch; the date code marks when the device was produced. Together they let a shipment be tied back to a specific production run, which matters for quality review, field returns and audit follow-up.
Lot-level traceability keeps the part number, lot, date code, supplier and inspection record attached to the shipment. Records should be retrievable later, and incoming inspection should verify source, marking, date code and package before the lot enters stock.